Recommendations for the successful erection of medium voltage switchgear


0

Erection of MV switchgearElectrical engineers working on project execution know that switchgear erection brings many challenges, no matter the voltage level. The switchgear cannot always be assembled in the factory and shipped to the site as a complete plant, so it is usually necessary to pack the equipment in its individual cubicles, ship it to the site, and eventually erect it.Recommendations for the successful erection of medium voltage switchgear (photo credit: jjloughran.com)Erection includes the setting in place of these cubicles, their interconnection both mechanically and electrically, and the fitting of any extra relays together with the power and control cables. The chambers may have to be filled with insulating media of different types.Once the equipment has been erected it needs to be commissioned, which is defined as the work of testing and finally placing in service of the installed apparatus.Before being put into service, tests must be carried out on the complete equipment to prove that it meets the required specification.The focus of this technical article will be the metal-enclosed switchgear (switchgear assemblies with an external metal enclosure intended to be earthed, and complete except for external connections), and metal-clad switchgear (metal-enclosed switchgear in which components are arranged in separate compartments with metal enclosures intended to be earthed).Table of contents:Storage of MV switchgearErection:FoundationsGeneral assemblyBusbar and circuit chamber assemblyCablingEarthingOil fillingGas fillingVacuum interruptersSmall wiringFinal inspection 1. Storage of MV switchgearIt is best to deliver the switchgear cubicles at a time convenient for their immediate erection. However, it sometimes (often) happens that the site works are delayed, in which case the switchgear must be stored carefully until it is needed.On delivery, it is important to check that all items are present and correct in accordance with the delivery note and then to store these components carefully to ensure that no parts go astray.At all times, care must be taken to maintain the condition of the stored items; precautions must be taken to ensure that the equipment is properly stacked, for example, and that it is kept clean and dry.If possible, arrangements should be made to keep the building temperature in excess of the dew point so that condensation on the equipment is prevented and thereby the plant is protected from corrosion.Figure 1 – An example of medium voltage switchgear storageFigure 1 – Storage of medium voltage switchgear Go back to Contents Table ↑ 2. ErectionBefore commencing erection it must be ensured that the workforce is in possession of all the drawings and instructions required to erect the equipment, which is normally provided by the manufacturer. The substation in which the switchgear is to be erected should be as clean and dry as possible and all debris should have been cleared away.During erection particular attention should be paid to a number of points:Dirt and debris should be excluded from partially erected cubicles.All openings that are not in immediate use should be blanked off or covered by clean sheets.All electrical insulation should be kept clean and dry by being kept covered and, if necessary, heated.Materials that have been issued from stores and not yet used on erection should be stored safely and tidily.When handling the cubicles and major components care should be taken to observe the correct lifting arrangements and to make certain that slings are attached to the manufacturer’s designated lifting points. This ensures that no parts are subjected to undue strains or sudden stresses which could result in disturbed settings or other damage.Figure 2 – Lifting the MV cubicle from the truckFigure 2 – Lifting the MV cubicle from the truck (photo credit: switchpowerdistribution.co.uk) Go back to Contents Table ↑ 2.1 FoundationsThe successful erection and operation of the switchboard depend very largely on the accuracy of the foundations. The most useful form of fixing medium for the type of switchboard considered here is some form of proprietary channel embedded in the floor, containing captive adjustable nuts.These channels should be assembled truly parallel and level and should project slightly above the surrounding floor. This is so that the switchgear can be clamped to the channels themselves which are then known to be at the correct level.Less commonly nowadays, holes may be cast in the floor in which suitable foundation blots can be grouted after the switchgear has been erected carefully.Figure 3 – Switchgear foundation and cable trenchFigure 3 – Switchgear foundation and cable trench Go back to Contents Table ↑ 2.2 General assemblyIt is normal to commence the assembly of a distribution switchboard from the center unit. This minimizes any effect of a build-up of errors as the equipment is erected. Any inter-unit tie-bolts are loosely positioned as erection proceeds, and all units lined up onto the center unit.Plumb lines should be used on each unit to ensure good alignment. When all units have been placed in position and checked for alignment, the inter-unit bolts may be tightened and checks may be made that any withdrawable portions can be entered or withdrawn smoothly.Instrument panels and any other component details should then be added to the switchboard.Go back to Contents Table ↑ 2.3 Busbar and circuit chamber assemblyThe actual section of the busbars to be used should be quoted on the manufacturer’s drawings and care must be taken to ensure that the appropriate section is used for a particular unit. Some general guidelines on the preparation of contact surfaces are given below, but it cannot be overstressed that at all times the manufacturer’s instructions must be followed.Contact surfaces must be cleaned carefully before assembly, using fine emery cloth where the surface of the contact is of natural finish, and using a proprietary silver polish if the surfaces are plated. Where the connections have threads these should be cleaned with a fine scratch brush. After cleaning, the joint faces must be wiped with a clean lint-free cloth to remove any dust, and the joints assembled as soon as possible.Normally, the lower busbar is connected up first, with the joints insulated as required, ensuring that a good electrical connection is made between all copper faces and that all securing nuts are tight. The next bar to be assembled will be the center one and, finally, the top one.The same treatment of joint faces must be carried out on all other connection joints within the circuit chamber, such as connections for VTs.Figure 4 – Medium voltage cubicles: Busbar chamber assemblyFigure 4 – Medium voltage cubicle – Busbar chamber assemblyThe manufacturer’s instructions should be checked carefully to see whether any or all of the joints that have been made on-site are required to be insulated. If this is the case then the components needed should have been supplied with the equipment and the instructions given by the manufacturer should be followed carefully, particularly in respect of any recommended safety precautions, with special attention to the chemical reagents that may be used.Go back to Contents Table ↑ 2.4 CablingThe preparation of the cables for connection to the switchgear is a specialist occupation and an experienced jointer should be employed for this purpose. The cable has to be laid carefully to avoid tight bends and the length of the cable lug measured very carefully to avoid any stress on the cable once the joint has finally been made. Minimum bending radii for cables are specified in BS 6480 (note that this standard is obsolete, but remains usable).Insulation of the exposed cable and of the joint is frequently provided by means of heat-shrinkable plastics sleeves. These should be applied and terminated in accordance with the manufacturer’s specific instructions. Where proprietary cable connectors are supplied for the termination of the cables, apply these with careful reference to the termination maker’s instructions, or employ a specialist contractor.Where crimping is employed for the attachment of lugs or thimbles to the cable core, it is vitally important only to use the type and size specified by the maker for the core size in use.Occasionally, paper cables are still terminated in compound-filled boxes and where this is the case care should be taken to ensure that the compound used is continually stirred during the melting period, to avoid excessive heating and possible burning of the compound at the bottom of the boiler. Care must be taken to ensure the cleanliness of the cable box and all utensils associated with this operation.Figure 5 – Cable box connections of medium voltage switchgear type ‘Genie Evo’ by Schneider ElectricFigure 5 – Cable box connections of medium voltage switchgear type Genie Evo by Schneider Electric (photo credit: Will Kendal via Twitter)The cable box itself, and any buckets or ladles which are used in the operation, must be pre-heated before use and the compound at the appropriate temperature should be poured slowly to avoid splashing and the inclusion of air bubbles. When the cable box is filled to its indicated level, the compound should be allowed to cool slowly, avoiding draughts.If the compound falls below the indicated level on cooling, it should be topped up while still warm to ensure a good bond between the main mass and the topping layer.Figure 6 – Erection of switchgearFigure 6 – Erection of switchgear – The devil is in the detail! (photo credit: ABB) Go back to Contents Table ↑ 2.5 EarthingEach unit forming part of any installation must be earthed by means of a copper strip fastened by a bolt or stud connection. This earth strip must be continuous and connected to all units and fastened to the main earth. All joints must be cleaned and treated as busbar joints. Special attention should be paid to the earthing of cable sheaths at cable glands.Figure 7 – 11kV connectors terminating EPR cable into medium voltage switchgearFigure 7 – 11kV connectors terminating EPR cable into medium voltage switchgear (photo credit: Thorne & Derrick) Go back to Contents Table ↑ 2.6 Oil fillingWhere chambers have to be filled with insulating oil on site it should first be checked that the oil supplied is in accordance with the manufacturer’s recommended grade. All electrical oils must conform with BS 148 and the oils must be tested for an electrical breakdown before filling, as described in BS 148 (Recycled mineral insulating oil for transformers and switchgear – Specification).The equipment must be filled to the indicated level, and it is advisable to fill voltage transformers (VTs) after they have been positioned on the switchgear. The indicated level is usually based on an ambient temperature of 15°C, and if the actual site temperature differs significantly from this, then due allowance should be made.Go back to Contents Table ↑ 2.7 Gas fillingGas-filled circuit-breakers or switchgear compartments are usually shipped filled. Where the design pressure is relatively high the manufacturer may avoid shipping problems by filling only to just above atmospheric pressure and topping up to the recommended filling pressure on site.In this connection, it is necessary to understand the two defined pressure levels used in the standards for gas-filled switchgear. These are:the filling pressure: which is the pressure to which the enclosure is filled before being put into service, andthe minimum functional pressure: which is the lowest pressure at which the switchgear retains all its ratings.It is important to determine the filling pressure recommended by the manufacturer for the particular switchgear being erected so that it can be checked to ensure that it is filled to this level before commissioning. In some cases, it may be recommended to take a sample of the gas for test before energizing the switchgear.If this is the case, then the manufacturer’s instructions must be very carefully followed, to avoid loss or contamination of the gas.Go back to Contents Table ↑ 2.8 Vacuum interruptersIt is often recommended that the integrity of the vacuum in the interrupters be checked before putting into service to ensure that no damage has been done during the shipping process. The manufacturer’s handbook should be consulted for guidance on this point since it usually involves applying a high voltage across the open contacts of the (or each) interrupter.Precautions should be taken to safeguard personnel from the possible generation of X-rays during this procedure. The manufacturer will have given guidance on this point also. Generally, it is possible to apply this voltage without exposing the vacuum interrupter, so that the metal enclosure can act as a screen. In such a case there will be no possibility of radiation, external to the enclosure.When a vacuum circuit breaker is commissioned or undergoes routine tests, it is very important to be able to ascertain whether or not the Vacuum Interrupter (VI) is intact before putting it back into operation.Interrupter tester enables you to check the integrity of the vacuum interrupter quickly and conveniently by means of the known relationship between the flashover voltage and the vacuum interrupter. A suitable test voltage (DC) is applied to the breaker, and the result is known immediately.Go back to Contents Table ↑ 2.9 Small wiringIt is usually necessary to complete small wiring connections between the instrument panels on adjacent cubicles and to connect external multicore cables to the control cable terminating boxes, which are usually mounted at the rear of the switchgear units.If it is not already contained on the wiring diagram, a useful aid to ensure the correct connection for multicore cables is to list the cores in order and record the appropriate connection to be made to each core at each end of the cable.Figure 8 – Checking small wiring in medium voltage switchgearFigure 8 – Checking small wiring in medium voltage switchgear Go back to Contents Table ↑ 3. Final inspectionAfter the switchboard has been finally erected, all securing bolts tightened, all busbars and other connections completed, all insulation finished, cables connected and small wiring completed, a final inspection should be made.The following is a typical, but by no means exhaustive, checklist:Before fitting covers, all chambers should be checked for complete cleanliness and the absence of all foreign matter.Once the covers have been fitted, it should be checked that all fixing screws are in place, and secure.All labels, where required, should be fitted and visible.Any mechanical interlocks should be checked; safety shutters, where fitted, must be checked to be operative.All withdrawable items should be proved to be capable of extraction and isolation as required.All fuses and links of the correct current rating should be inserted into the appropriate holders.All exposed insulation surfaces must be clean and dry.A final check should be made for continuity of earthing.All tools used in the erection of the switchboard should be carefully accounted for.Go back to Contents Table ↑ Sources:Handbook of electrical installation practice by G. StokesCommissioning and maintenance of electrical power system – Keith Harker


Like it? Share with your friends!

0

What's Your Reaction?

hate hate
0
hate
confused confused
0
confused
fail fail
0
fail
fun fun
0
fun
geeky geeky
0
geeky
love love
0
love
lol lol
0
lol
omg omg
0
omg
win win
0
win
Joseph

0 Comments

Your email address will not be published. Required fields are marked *